Enter a task

Every task can be edited very simply in this view.

PlanMyDay-EditEntry

A sort explanation of the fields:

Task is active: Tasks can be switched in an inactive state. Then they will not be considered for time planning, but must not be deleted.

Dynamic start: Means, that the task will be scheduled, when the previous tasks was finished (and eventually some time-buffer was added). Tasks with a fixed start-time will pe placed at exactly this time in your schedule, as long as the are in the future.

Duration: The duration of the task. Any duration can be selected.

Priority: With this option, tasks can be prioritized. The priority is visualized in the task-list on the right side by a colored rectangle.

Task: A short description for the task

Note: A longer notice for the activity.

xx %: To adjust the progress of a task manually

Advertisements